RESIDENTIAL CONSTRUCTION
My main task was to prepare architectural drawings for new construction. I modified about 40% of the original architectural drawings, in order to obtain a construction permit for the project. Furthermore, I contributed to the architectural design process concerning the modified portion of the building.
Independent contract | Summer 2013
